翻訳と辞書
Words near each other
・ Saffron Lane sports centre
・ Saffron Revolution
・ Saffron rice
・ Saffron shiner
・ Saffron siskin
・ Saffron Sky
・ Saffron Square
・ Saffron Taylor
・ Saffron Technology
・ Saffron terror
・ Safety of electronic cigarettes
・ Safety of emergency medical services flights
・ Safety of high-energy particle collision experiments
・ Safety of the Queen, etc. Act 1584
・ Safety on the London Underground
Safety on the Mass Rapid Transit (Singapore)
・ Safety orange
・ Safety package
・ Safety Patrol (film)
・ Safety pharmacology
・ Safety Pharmacology Society
・ Safety pilot
・ Safety pin
・ Safety Pin & Leopard Skin
・ Safety play
・ Safety Promotion Center
・ Safety Provisions (Building) Convention, 1937
・ Safety razor
・ Safety reflector
・ Safety relay


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Safety on the Mass Rapid Transit (Singapore) : ウィキペディア英語版
Safety on the Mass Rapid Transit (Singapore)

The safety of the Mass Rapid Transit system in Singapore was questioned by the public after several accidents on the system during the 1980s and 1990s. Most problems have been addressed, and many safety measures are visible to users of the system.
==Significant incidents==
5 August 1993 (7:50 am) – Two C151 trains collided with each other at Clementi, resulting in 132 injuries. The collision occurred because a work train that did maintenance work earlier that morning had spilled oil onto the tracks. One of the trains on that stretch of track that morning had been unable to brake in time because of the oil, resulting in a collision with a stationary train which was waiting to move off upon the recharging of its brakes.
9 October 1997 (2:00 am) – A maintenance train derailed in the tunnel near Toa Payoh. The derailment occurred because a staff member had failed to reset the track alignment properly. Disruption to train services between Bishan & Newton lasted about 8 hours.
13 April 1999 (10:00 am) – An empty C651 train on its way back to Bishan Depot after the morning peak service derailed between the Yio Chu Kang and Ang Mo Kio. The derailment occurred because the station master had failed to reset the track alignment properly. Disruption to train services lasted about 7 hours.
23 April 2002〔http://smrt.com.sg/news/2002/04_23a.html〕 – 21 C751B trains were withdrawn from service due to faulty gearboxes, though there were no safety implications. There were reduced train services on all lines resulting from this shortage of trains.
3 March 2003 (7:30 pm)〔http://smrt.com.sg/news/2003/03_03.html〕 – A car crashed onto a stretch of at-grade track along Lentor Avenue in between Khatib and Yio Chu Kang, resulting in a light, minor collision by an oncoming train. Disruption to train services between along this section of the line lasted almost 3 hours.
24 July 2006 (12:45 pm)〔(Welcome to SBS Transit )〕 – HarbourFront, Outram Park, Chinatown and Clarke Quay were closed due to a loss of traction power with a train stalling after Outram Park. Attempts to bring the power back failed and hundreds of passengers were evacuated from the trains. According to later investigations, a cable which supplied traction power came loose. Train service was disrupted for hours and operator SBS Transit activated shuttle bus services to ferry commuters between affected stations.〔http://www.channelnewsasia.com/stories/singaporelocalnews/view/220892/1/.html〕
21 January 2008 (5.30 am–12 pm)〔http://smrt.com.sg/news/2008/press_release_%20train_service_delay_on_21_Jan08.pdf〕 – There was no train service from Tanah Merah to Pasir Ris due to an accident involving a service train in the middle of Simei and Tampines at midnight. Trains were disrupted; there were no trains from Tanah Merah to Pasir Ris. Many commuters were affected as the incident occurred in the morning's peak hours. SBS Transit and SMRT deployed buses to replace train services.
20 September 2011 – On 20 September 2011, a power fault disrupted train services on all 16 stations on the Circle Line. The four hours delay left thousands of commuters stranded during rush-hour. It was reported that leaks and a damaged cable along the Circle Line were the cause of the disruption. The disruption started at about 5.30am. Train services were gradually restored from 8am and all services were restored just before 10am. Dakota and Mountbatten stations were the last two to resume operations. Investigations were carried out, and it was found that a faulty cable beneath the platform level at Dakota Station caused a power fault on Tuesday morning that affected train services at all 16 stations on the Circle Line. 27,000 passengers were affected by the disruption during the four hours delay, with bus bridging services plying the Circle Line route.
17 October 2011 – On 17 October 2011, at approximately 8.36am, a train heading from Labrador Park to Pasir Panjang experienced a fault and had to be taken out of service. Announcements were made in the affected stations, while bus bridging services were provided plying the affected section of the Circle Line. Normal train services resumed at 11.12am.
14 December 2011 (6 am–11.45 am) – A communication network problem caused service disruption between Marymount and one-north at 6 am.〔(【引用サイトリンク】 title=SMRT apologises for Circle Line disruption )〕 Partial train service was restored by 6.40am but extra trains could not be deployed for the morning peak hours. Bus bridging services were provided for stations between Marymount and one-north MRT stations and also between Serangoon and one-north MRT stations. SMRT said services had resumed around 10am but TODAY's deputy news editor Leong Wee Keat, who was at Bishan MRT, reported that the service was still slow.〔(【引用サイトリンク】 title=Circle Line disrupted )〕 In an updated statement, SMRT reported that full services were resumed at 11.45am and bus bridging services were extended till 1pm.〔〔(Dec 14, 2011. Retrieved 2011-12-14. )〕
15 December 2011 (6.45 pm–11.40 pm) – A 40m stretch of power rail damaged between City Hall and Dhoby Ghaut MRT stations caused service disruption on the North-South line between Marina Bay and Bishan MRT stations.〔(【引用サイトリンク】 title=Partial train services resume after disruption on North-South line )〕 Services on southbound trains resumed at around 9pm while North-bound train services between the affected stations resumed at 11.40pm. Lights went off and ventilation was inadequate in some trains. A window in C151 067/068 was smashed and doors were forced open to provide ventilation.〔(【引用サイトリンク】 title=North-South MRT Line breakdown hits thousands )〕 Commuters were evacuated from trains and moved out of the stations.〔 Bus bridging services were activated between the affected stations.
17 December 2011 – A 50m stretch of power rail damaged between Newton and Orchard MRT stations, causing disruption to southbound service from 6.50am to 1.50pm, as an early morning. As due to the procedure of damaged rails and dislodged claws, the MRT was closed from 5.30am to 12pm on 18 December 2011.
26 December 2011 – On 26 December 2011, a loud bang was heard coming from a train along the North-East Line at about 7.20 pm. Operator SBS Transit said it was due to a sudden electrical surge on the train heading towards Punggol. A short in the surge protector resulted in a loud sound. Passengers were asked to disembark at Hougang station as a safety precaution. This caused a delay of nine minutes for the service towards Punggol.
15 March 2012 – Train services disrupted, between 6.30 am to 4.35 pm, on North East Line between Harbourfront and Dhoby Ghaut stations due to a power supply fault.
17 August 2012 – Train services along the whole stretch of North East Line disrupted due to a power supply fault and a subsequent signalling fault.〔(【引用サイトリンク】 Delay in the North East Line Train Service Due to Two Faults – Signalling Fault Resolved, Free Bus Shuttles Being Deployed for Evening Peak )〕 This was due to a broken U-bolt which caused train delays throughout the day.〔(【引用サイトリンク】 LTA probes train delays on NEL last )
10 January 2013 – Train services in both directions on the North East Line was disrupted due to a power fault, between 9.50 a.m. to 4.35 p.m.〔(【引用サイトリンク】 title=NEL services fully resumed at 4:35pm: SBS Transit )